Bahan Kajian
  1. Pendahuluan Perencanaan Tambang Terbuka: Konsep dasar perencanaan tambang, tujuan teknis dan ekonomis, horizon perencanaan (jangka panjang & jangka pendek), sifat iteratif perencanaan tambang
  2. Ruang Lingkup Perencanaan Tambang Terbuka: Ultimate pit limit, tahapan penambangan (pushback/staging), penjadwalan produksi, pemilihan alat, estimasi biaya tambang
  3. Parameter Teknis Perencanaan Tambang: Target produksi, geometri pit dan jenjang, batasan operasional, batasan geoteknik
  4. Peralatan Tambang dalam Konteks Perencanaan: Review sistem alat gali–muat–angkut, produktivitas alat, kesesuaian alat dengan desain pit dan target produksi
  5. Geoteknik Tambang Terbuka dalam Perencanaan: Review konsep stabilitas lereng, sudut lereng, implikasi geoteknik terhadap desain pit dan tahapan penambangan
  6. Peledakan Tambang Terbuka dalam Perencanaan: Review prinsip peledakan, fragmentasi batuan, pengaruh terhadap produktivitas alat dan efisiensi operasi
  7. Kesehatan dan Keselamatan Kerja (K3): Review aspek keselamatan kerja dan implikasinya terhadap desain tambang dan tahapan operasi
  8. Lingkungan Tambang dalam Perencanaan: Review batasan lingkungan, reklamasi, waste dump design, dan pengelolaan air tambang
  9. Keekonomian Tambang dalam Perencanaan: Review parameter ekonomi tambang, cash flow, NPV, IRR, serta peran ekonomi dalam keputusan desain tambang
  10. Integrasi Aspek Teknis, Keselamatan, Lingkungan, dan Ekonomi: Hubungan antar aspek dalam penyusunan rencana tambang terbuka
  11. Konsep Studi Kelayakan Tambang: Tujuan feasibility study, tahapan studi kelayakan, komponen utama kajian teknis dan ekonomis
  12. Perancangan Tambang dalam Studi Kelayakan: Integrasi pit design, staging, production scheduling, dan strategi penambangan
  13. Estimasi Produksi & Umur Tambang: Penetapan target produksi, sequencing, kapasitas sistem tambang
  14. Estimasi Biaya Tambang: Estimasi CAPEX, OPEX, dan komponen biaya utama tambang
  15. Evaluasi Ekonomi Tambang: Penyusunan cash flow, analisis NPV, IRR, payback period, sensitivitas ekonomi
  16. Penyusunan & Presentasi Studi Kelayakan Tambang: Integrasi hasil analisis studio
  17. Studi Kasus Komoditas Tambang Indonesia: Batubara, nikel, bauksit, emas, timah primer, bahan galian industri
  1. Introduction to Open Pit Mine Planning: Fundamental mine planning concepts, technical and economic objectives, planning horizons (long-term and short-term), and the iterative nature of mine planning
  2. Scope of Open Pit Mine Planning: Ultimate pit limit, mining phases (pushback/staging), production scheduling, equipment selection, and mine cost estimation
  3. Technical Parameters in Mine Planning: Production targets, pit and bench geometry, operational constraints, and geotechnical constraints
  4. Mining Equipment in Planning Context: Review of loading–hauling systems, equipment productivity, and equipment suitability with pit design and production targets
  5. Open Pit Geotechnical Considerations: Review of slope stability concepts, slope angles, and geotechnical implications for pit design and mining phases
  6. Drilling and Blasting in Planning Context: Review of blasting principles, rock fragmentation, and their influence on equipment productivity and operational efficiency
  7. Occupational Health and Safety (OHS): Review of safety considerations and their implications for mine design and operational stages
  8. Environmental Considerations in Mine Planning: Review of environmental constraints, reclamation, waste dump design, and mine water management
  9. Economic Considerations in Mine Planning: Review of mine economic parameters, cash flow, NPV, IRR, and the role of economics in mine design decisions
  10. Integration of Technical, Safety, Environmental, and Economic Aspects: Interrelationships among key considerations in open pit mine planning
  11. Mine Feasibility Study Concept: Objectives of feasibility studies, stages of feasibility studies, and key technical and economic components
  12. Mine Design within Feasibility Study: Integration of pit design, staging, production scheduling, and mining strategy
  13. Production & Mine Life Estimation: Establishment of production targets, mining sequence, and mine system capacity
  14. Mine Cost Estimation: Estimation of CAPEX, OPEX, and major mine cost components
  15. Mine Economic Evaluation: Cash flow development, NPV analysis, IRR analysis, payback period, and economic sensitivity analysis
  16. Feasibility Study Development & Presentation Integration and presentation of studio project results
  17. Indonesian Mining Commodity Case Studies: Coal, nickel, bauxite, gold, primary tin, and industrial minerals
Capaian Pembelajaran Mata Kuliah (CPMK)
  1. Mahasiswa mampu menjelaskan dan menganalisis konsep dasar perencanaan tambang terbuka, termasuk tujuan teknis dan ekonomis, dan sifat iteratif perencanaan tambang
  2. Mahasiswa mampu menjelaskan dan menganalisis ruang lingkup perencanaan tambang terbuka serta parameter teknis utama, termasuk ultimate pit limit, tahapan penambangan, target produksi, dan geometri pit
  3. Mahasiswa mampu menjelaskan dan menganalisis keterkaitan aspek teknis tambang terbuka (peralatan, geoteknik, peledakan) dalam konteks perencanaan tambang
  4. Mahasiswa mampu menjelaskan dan menganalisis peran aspek kesehatan, keselamatan kerja (K3), dan lingkungan dalam desain dan perencanaan tambang terbuka
  5. Mahasiswa mampu menjelaskan dan menginterpretasikan parameter ekonomi tambang serta pengaruhnya terhadap keputusan perencanaan tambang terbuka
  6. Mahasiswa mampu menganalisis dan mengevaluasi alternatif rencana tambang dengan mempertimbangkan batasan teknis, keselamatan, lingkungan, dan ekonomi
  7. Mahasiswa mampu mensintesiskan aspek teknis, operasional, dan ekonomi dalam penyusunan studi kelayakan tambang terbuka berbasis studi kasus komoditas tambang Indonesia
  1. Students are able to explain and analyze the fundamental concepts of open pit mine planning, including technical and economic objectives and the iterative nature of mine planning
  2. Students are able to explain and analyze the scope of open pit mine planning and its key technical parameters, including ultimate pit limits, mining phases, production targets, and pit geometry
  3. Students are able to explain and analyze the relationships between technical open pit mining aspects (equipment, geotechnics, and drilling and blasting) within the mine planning context
  4. Students are able to explain and analyze the role of occupational health and safety (OHS) and environmental considerations in open pit mine design and planning
  5. Students are able to explain and interpret mine economic parameters and their influence on open pit mine planning decisions
  6. Students are able to analyze and evaluate alternative mine plans by considering technical, safety, environmental, and economic constraints
  7. Students are able to synthesize technical, operational, and economic aspects in the preparation of an open pit mine feasibility study based on Indonesian mining commodity case studies
Metode PembelajaranKuliah, Studio, Presentasi dan SidangLectures, Studio, Presentations, and Project Defense
Modalitas PembelajaranLuring SinkronOffline in class
Jenis NilaiABCDE
Metode PenilaianPresentasi Kemajuan I, Presentasi Kemajuan II, Sidang, LaporanInterim Presentation I, Interim Presentation II, Final Defense, Final Report
Catatan Tambahan