Kode Mata KuliahTL6110 / 2 SKS
Penyelenggara253 - Teknik Lingkungan / FTSL
KategoriKuliah
Bahasa IndonesiaEnglish
Nama Mata KuliahKedaruratan B3 di IndustriHazardous Waste Emergencies in Industry
Bahan Kajian
  1. karakterisasi B3,
  2. peraturan terkait pengelolaan B3 dan Limbah B3
  3. identifikasi bahaya dan risiko terkait operasional B3 dan pengelolaan Limbah B3,
  4. Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
  5. kesiagaan dan tanggap darurat B3, pelatihan, dokumentasi, penyediaan sarana tanggap darurat, pemeliharaan dan operasionalnya
  1. B3 characterization,
  2. regulations related to the management of B3 and B3 Waste
  3. identification of hazards and associated risks B3 operations and B3 waste management,
  4. Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
  5. B3 emergency preparedness and response, training, documentation, provision of emergency response facilities, maintenance and operations
Capaian Pembelajaran Mata Kuliah (CPMK)
  1. Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
  1. Students have the ability to demonstrate expertise in specific areas of environmental engineering, namely: Environmental Technology and Management, Pollution Prevention and Control, Environmental Safety and Health, and Sustainability in Environmental Engineering.
Metode PembelajaranProject based/case study Presentasi tugasProject based/case study Task presentation
Modalitas PembelajaranAudio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompokKinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments
Jenis NilaiABCDE
Metode PenilaianPenilaian CPMK melalui nilai tugas/projectCPMK assessment through assignment/project grades
Catatan Tambahan