Kode Mata Kuliah | TL6110 / 2 SKS |
---|
Penyelenggara | 253 - Teknik Lingkungan / FTSL |
---|
Kategori | Kuliah |
---|
| Bahasa Indonesia | English |
---|
Nama Mata Kuliah | Kedaruratan B3 di Industri | Hazardous Waste Emergencies in Industry |
---|
Bahan Kajian | - karakterisasi B3,
- peraturan terkait pengelolaan B3 dan Limbah B3
- identifikasi bahaya dan risiko terkait
operasional B3 dan pengelolaan Limbah B3,
- Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
- kesiagaan dan tanggap darurat B3, pelatihan, dokumentasi, penyediaan sarana tanggap darurat, pemeliharaan dan operasionalnya
| - B3 characterization,
- regulations related to the management of B3 and B3 Waste
- identification of hazards and associated risks
B3 operations and B3 waste management,
- Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
- B3 emergency preparedness and response, training, documentation, provision of emergency response facilities, maintenance and operations
|
---|
Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
| - Students have the ability to demonstrate expertise in specific areas of environmental engineering, namely: Environmental Technology and Management, Pollution Prevention and Control, Environmental Safety and Health, and Sustainability in Environmental Engineering.
|
---|
Metode Pembelajaran | Project based/case study
Presentasi tugas | Project based/case study
Task presentation |
---|
Modalitas Pembelajaran | Audio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompok | Kinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments |
---|
Jenis Nilai | ABCDE |
---|
Metode Penilaian | Penilaian CPMK melalui nilai tugas/project | CPMK assessment through assignment/project grades |
---|
Catatan Tambahan | | |
---|