| Kode Mata Kuliah | GD4211 / 3 SKS | 
|---|
| Penyelenggara | 151 - Teknik Geodesi dan Geomatika / FITB | 
|---|
| Kategori | Kuliah | 
|---|
|  | Bahasa Indonesia | English | 
|---|
| Nama Mata Kuliah | Survei Jaringan Pipa dan Terowongan | Pipeline Network & Tunnel Surveying | 
|---|
| Bahan Kajian | Jaringan Pipa dan TerowonganKonstruksi Jaringan Pipa (Gas, Air, Minyak) dan Saluran PembuanganPenyiapan Layout Jaringan Pipa dan Penyesuaian Alignment PipaPematokan Jaringan PipaPemetaan Jaringan Pipa Bawah TanahLayout Konstruksi TerowonganTeknologi Pemetaan Jaringan Jaringan Pipa dan Terowongan
- Metode Terstris
- Metode Laser Scanning
- GNSS
- INSMonitoring Geometri dan Pemeliharaan Terowongan
 | Pipelines and TunnelsConstruction of Pipelines (Gas, Water, Oil) and SewersPipe Network Layout Preparation and Pipe Alignment AdjustmentPipeline Network BenchmarkingMapping of Underground PipelinesTunnel Construction LayoutPipeline and Tunnel Network Mapping Technology
- Terrestrial Method
- Laser Scanning Method
- GNSS
- INSGeometry Monitoring and Tunnel Maintenance
 | 
|---|
| Capaian Pembelajaran Mata Kuliah (CPMK) | Mahasiswa mampu menjelaskan pengertian jaringan pipa dan terowonganMahasiswa mampu menganalisis danĀ  menjelaskan jaringan pipaMahasiswa mampu menjelaskan metode survey dalam penyiapan layout dan grade/alignment untuk jaringan pipaMahasiswa mampu menganalisis dan menjelaskan metode survey yang tepat untuk pematokan jaringan pipaMahasiswa mampu menjelaskan metode survey pemetaan pipa bawah tanahMahasiswa dapat menjelaskan metode dalam survey pemetaan terowonganMahasiswa mampu menjelaskan teknologi alternatif dalam survey dan pemetaan jaringan pipa dan terowonganMahasiswa mampu menjelaskan metode survey pemetaan dalam analisis geometri dan pemeliharaan konstruksi terowongan
 | Students are able to explain the meaning of pipelines and tunnelsStudents are able to analyze and explain pipelinesStudents are able to explain survey methods in preparing layout and grade/alignment for pipelinesStudents are able to analyze and explain the appropriate survey methods for pipe network benchmarkingStudents are able to explain the survey method of underground pipe mappingStudents are able to explain the methods in tunnel mapping surveysStudents are able to explain alternative technologies in surveying and mapping pipelines and tunnelsStudents are able to explain mapping survey methods in geometry analysis and maintenance of tunnel construction
 | 
|---|
| Metode Pembelajaran | SCL: PBL, CBL, PjBL | SCL: PBL, CBL, PjBL | 
|---|
| Modalitas Pembelajaran | Luring, Sikron, Asinkron | Offline, Synchronous, Asynchronous | 
|---|
| Jenis Nilai | ABCDE | 
|---|
| Metode Penilaian | Tertulis: Pilihan, Uraian, Esai
Lisan: Presentasi
Tugas: Laporan, Demonstrasi, Praktik | Written: Optional, Description, Essay
Oral: Presentation
Assignment: Report, Demonstration, Practice | 
|---|
| Catatan Tambahan |  |  | 
|---|