| Kode Mata Kuliah | TL6110 / 3 SKS |
|---|
| Penyelenggara | 253 - Teknik Lingkungan / FTSL |
|---|
| Kategori | Kuliah |
|---|
| Bahasa Indonesia | English |
|---|
| Nama Mata Kuliah | Kedaruratan B3 di Industri | Hazardous Waste Emergencies in Industry |
|---|
| Bahan Kajian | - Karakterisasi B3,
- Peraturan terkait pengelolaan B3 dan Limbah B3
- Identifikasi bahaya dan risiko terkait operasional B3 dan pengelolaan Limbah B3,
- Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
- Kesiagaan dan tanggap darurat B3, pelatihan, dokumentasi, penyediaan sarana tanggap darurat, pemeliharaan dan operasionalnya
| - B3 characterization,
- Regulations related to the management of B3 and B3 Waste
- Identification of hazards and associated risks
B3 operations and B3 waste management,
- Risk Management, Process Hazard Analysis, What if Analysis, FTA, BTA, Hazid, Hazop, HIRA, JSA, Dow Fire and Explosion Index
- B3 emergency preparedness and response, training, documentation, provision of emergency response facilities, maintenance and operations
|
|---|
| Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
| - Students are able to demonstrate specific expertise in the field of environmental engineering, including: Environmental Technology and Management, Pollution Prevention and Control, Environmental Health and Safety, and Sustainability in Environmental Engineering.
|
|---|
| Metode Pembelajaran | Project based/case study
Presentasi tugas | Project based/case study
Task presentation |
|---|
| Modalitas Pembelajaran | Audio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompok | Kinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments |
|---|
| Jenis Nilai | ABCDE |
|---|
| Metode Penilaian | Penilaian CPMK melalui nilai tugas/project | CPMK assessment through assignment/project grades |
|---|
| Catatan Tambahan | | |
|---|