| Kode Mata Kuliah | TL6212 / 3 SKS |
|---|
| Penyelenggara | 253 - Teknik Lingkungan / FTSL |
|---|
| Kategori | Kuliah |
|---|
| Bahasa Indonesia | English |
|---|
| Nama Mata Kuliah | Ekonomi Lingkungan dan Valuasi | Environmental Economic and Valuation |
|---|
| Bahan Kajian | - Logika pengelolaan lingkungan dan pengendalian pencemaran dalam perspektif ekonomi.
- Konsep ekonomi ekologi dan ekonomi lingkungan
- Konsep pasar sempurna, internalisasi biaya lingkungan dalam biaya produksi, dan circular economy,
- Pembiayaan pembangunan berbasis risiko lingkungan dan instrumen ekonomi lingkungan
- Teknik valuasi lingkungan.
| - The logics of environmental management and pollution control from an economic perspective.
- The concept of ecological economics and environmental economics,
- Perfect market concept, internalization of environmental costs in production costs, and circular economy,
- Environmental risk-based development financing and instruments of environmental economics
- Environmental valuation techniques
|
|---|
| Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
| - Students are able to demonstrate specific expertise in the field of environmental engineering, including: Environmental Technology and Management, Pollution Prevention and Control, Environmental Health and Safety, and Sustainability in Environmental Engineering.
|
|---|
| Metode Pembelajaran | Project based/case study
Presentasi tugas | Project based/case study
Task presentation |
|---|
| Modalitas Pembelajaran | Audio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompok | Kinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments |
|---|
| Jenis Nilai | ABCDE |
|---|
| Metode Penilaian | Penilaian CPMK melalui nilai tugas/project/ujian | CPMK assessment through assignment/project grades/exams |
|---|
| Catatan Tambahan | | |
|---|