Kode Mata KuliahTL6201 / 2 SKS
Penyelenggara253 - Environmental Engineering / FTSL
KategoriLecture
Bahasa IndonesiaEnglish
Nama Mata KuliahSistem Manajemen Air BerkelanjutanSustainable Water Management System
Bahan Kajian
  1. pengembangan infrastruktur sumber daya air berkelanjutan
  2. pemahaman terhadap watak aliran
  3. komponen sikulus hidrologi, karakteristik komponen hidrologi (P, Q) yang bersifat acak dan stokastik, serta sistem daerah aliran sungai
  4. pengembangan infrastruktur pengembangan sumber daya air berkelanjutan
  5. insfrastruktur banjir (system drianase) dan infrastruktur kering (sistem pengembangan air minum)
  1. development of sustainable water resources infrastructure
  2. understanding of the nature of flow
  3. hydrological cycle components, random and stochastic characteristics of hydrological components (P, Q), as well as river basin systems
  4. development of sustainable water resources development infrastructure
  5. flood infrastructure (drainage system) and dry infrastructure (drinking water development system)
Capaian Pembelajaran Mata Kuliah (CPMK)
  1. Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
  1. Students have the ability to demonstrate expertise in specific areas of environmental engineering, namely: Environmental Technology and Management, Pollution Prevention and Control, Environmental Safety and Health, and Sustainability in Environmental Engineering.
Metode PembelajaranProject based/case study Presentasi tugasProject based/case study Task presentation
Modalitas PembelajaranAudio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompokKinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments
Jenis NilaiABCDE
Metode PenilaianPenilaian CPMK melalui nilai tugas/projectCPMK assessment through assignment/project grades
Catatan Tambahan