| Kode Mata Kuliah | TL6202 / 2 SKS |
|---|
| Penyelenggara | 253 - Environmental Engineering / FTSL |
|---|
| Kategori | Lecture |
|---|
| Bahasa Indonesia | English |
|---|
| Nama Mata Kuliah | Pencemaran dan Pemantauan Udara Toksik | Toxic Air Pollution and Monitoring |
|---|
| Bahan Kajian | - jenis pencemar udara toksik (limbah berbahaya udara) dan sumbernya,
- perilaku racun polutan udara di udara dan dampaknya,
distribusi dan penyebarannya, deposisinya, rute pemaparanya,
- teknik pengukuran (sampling) emisi racun udara dan analisanya,
- cara estimasi emisi serta transformasi dan penyisihannya
| - types of toxic air pollutants (hazardous air waste) and their sources,
- toxic behavior of air pollutants in the air and their impacts,
distribution and dissemination, deposition, routes of exposure,
- techniques for measuring (sampling) air toxic emissions and their analysis,
- how to estimate emissions as well as their transformation and allowance
|
|---|
| Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
| - Students have the ability to demonstrate expertise in specific areas of environmental engineering, namely: Environmental Technology and Management, Pollution Prevention and Control, Environmental Safety and Health, and Sustainability in Environmental Engineering.
|
|---|
| Metode Pembelajaran | Project based/case study
Presentasi tugas | Project based/case study
Task presentation |
|---|
| Modalitas Pembelajaran | Audio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompok | Kinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments |
|---|
| Jenis Nilai | ABCDE |
|---|
| Metode Penilaian | Penilaian CPMK melalui nilai tugas/project | CPMK assessment through assignment/project grades |
|---|
| Catatan Tambahan | | |
|---|