Kode Mata Kuliah | TL6210 / 2 SKS |
---|
Penyelenggara | 253 - Environmental Engineering / FTSL |
---|
Kategori | Lecture |
---|
| Bahasa Indonesia | English |
---|
Nama Mata Kuliah | Ekonomi Lingkungan dan Valuasi | Environmental Economic and Valuation |
---|
Bahan Kajian | - pengelolaan lingkungan dan pengendalian pencemaran dalam perspektif ekonomi.
- konsep ekonomi ekologi dan ekonomi lingkungan,
- konsep pasar sempurna, internalisasi biaya lingkungan dalam biaya produksi, circular economy,
- pembiayaan pembangunan berbasis risiko lingkungan,
- logika pengendalian pencemaran dalam perspektif ekonomi, dan teknik valuasi lingkungan.
| - environmental management and pollution control from an economic perspective.
- the concept of ecological economics and environmental economics,
- perfect market concept, internalization of environmental costs in production costs, circular economy,
- environmental risk-based development financing,
- the logic of pollution control in an economic perspective, and environmental valuation techniques.
|
---|
Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa memiliki kemampuan menunjukkan keahlian bidang teknik lingkungan secara spesifik yaitu: Teknologi dan Manajemen Lingkungan, Pencegahan dan Pengendalian Pencemaran, Keselamatan dan Kesehatan Lingkungan, serta Keberlanjutan dalam Teknik Lingkungan.
| - Students have the ability to demonstrate expertise in specific areas of environmental engineering, namely: Environmental Technology and Management, Pollution Prevention and Control, Environmental Safety and Health, and Sustainability in Environmental Engineering.
|
---|
Metode Pembelajaran | Project based/case study
Presentasi tugas | Project based/case study
Task presentation |
---|
Modalitas Pembelajaran | Audio Visual Kinestetik dengan pelaksanaan kombinasi dari daring/luring, sinkron/asinkron, tugas mandiri/kelompok | Kinesthetic Audio Visual with a combination of online/offline, synchronous/asynchronous, independent/group assignments |
---|
Jenis Nilai | ABCDE |
---|
Metode Penilaian | Penilaian CPMK melalui nilai tugas/project | CPMK assessment through assignment/project grades |
---|
Catatan Tambahan | | |
---|