Kode Mata Kuliah | GD4211 / 3 SKS |
---|
Penyelenggara | 151 - Geodesy and Geomatics Engineering / FITB |
---|
Kategori | Lecture |
---|
| Bahasa Indonesia | English |
---|
Nama Mata Kuliah | Survei Jaringan Pipa dan Terowongan | Pipeline Network & Tunnel Surveying |
---|
Bahan Kajian | - Jaringan Pipa dan Terowongan
- Konstruksi Jaringan Pipa (Gas, Air, Minyak) dan Saluran Pembuangan
- Penyiapan Layout Jaringan Pipa dan Penyesuaian Alignment Pipa
- Pematokan Jaringan Pipa
- Pemetaan Jaringan Pipa Bawah Tanah
- Layout Konstruksi Terowongan
- Teknologi Pemetaan Jaringan Jaringan Pipa dan Terowongan
- Metode Terstris
- Metode Laser Scanning
- GNSS
- INS
- Monitoring Geometri dan Pemeliharaan Terowongan
| - Pipelines and Tunnels
- Construction of Pipelines (Gas, Water, Oil) and Sewers
- Pipe Network Layout Preparation and Pipe Alignment Adjustment
- Pipeline Network Benchmarking
- Mapping of Underground Pipelines
- Tunnel Construction Layout
- Pipeline and Tunnel Network Mapping Technology
- Terrestrial Method
- Laser Scanning Method
- GNSS
- INS
- Geometry Monitoring and Tunnel Maintenance
|
---|
Capaian Pembelajaran Mata Kuliah (CPMK) | - Mahasiswa mampu menjelaskan pengertian jaringan pipa dan terowongan
- Mahasiswa mampu menganalisis danĀ menjelaskan jaringan pipa
- Mahasiswa mampu menjelaskan metode survey dalam penyiapan layout dan grade/alignment untuk jaringan pipa
- Mahasiswa mampu menganalisis dan menjelaskan metode survey yang tepat untuk pematokan jaringan pipa
- Mahasiswa mampu menjelaskan metode survey pemetaan pipa bawah tanah
- Mahasiswa dapat menjelaskan metode dalam survey pemetaan terowongan
- Mahasiswa mampu menjelaskan teknologi alternatif dalam survey dan pemetaan jaringan pipa dan terowongan
- Mahasiswa mampu menjelaskan metode survey pemetaan dalam analisis geometri dan pemeliharaan konstruksi terowongan
| - Students are able to explain the meaning of pipelines and tunnels
- Students are able to analyze and explain pipelines
- Students are able to explain survey methods in preparing layout and grade/alignment for pipelines
- Students are able to analyze and explain the appropriate survey methods for pipe network benchmarking
- Students are able to explain the survey method of underground pipe mapping
- Students are able to explain the methods in tunnel mapping surveys
- Students are able to explain alternative technologies in surveying and mapping pipelines and tunnels
- Students are able to explain mapping survey methods in geometry analysis and maintenance of tunnel construction
|
---|
Metode Pembelajaran | SCL: PBL, CBL, PjBL | SCL: PBL, CBL, PjBL |
---|
Modalitas Pembelajaran | Luring, Sikron, Asinkron | Offline, Synchronous, Asynchronous |
---|
Jenis Nilai | ABCDE |
---|
Metode Penilaian | Tertulis: Pilihan, Uraian, Esai
Lisan: Presentasi
Tugas: Laporan, Demonstrasi, Praktik | Written: Optional, Description, Essay
Oral: Presentation
Assignment: Report, Demonstration, Practice |
---|
Catatan Tambahan | | |
---|