Kode Mata KuliahMG6053 / 3 SKS
Penyelenggara225 - Teknik Metalurgi / FTTM
KategoriKuliah
Bahasa IndonesiaEnglish
Nama Mata KuliahMetalurgi Daur Ulang LanjutAdvanced Metallurgy of Recycling
Bahan Kajian
  1. Proses Pemisahan Fisik dan Pengolahan Bahan Kimia 
  2. Life-Cycle Assessment 
  3. Daur Ulang Berbagai Logam Dasar 
  4. Daur Ulang Material Kompleks 
  5. Perkembangan dan Permasalahan Metalurgi Daur Ulang 
  1. Physical Separation Processes and Chemical Processing of Materials
  2. Life-Cycle Assessment
  3. Recycling of Various Base Metals
  4. Recycling of Complex Materials
  5. Developments and Challenges in Metallurgical Recycling
Capaian Pembelajaran Mata Kuliah (CPMK)
  1. Mahasiswa memiliki pemahaman tentang pemisahan fisik serta kimia dan life-cycle assessment 
  2. Mahasiswa memiliki pemahaman daur ulang baja, aluminium, tembaga, timbal, seng, logam jarang, dan waste electrical and electronic equipment 
  3. Mahasiswa mampu merancang pabrik ekstraksi daur ulang logam 
  4. Mahasiswa memiliki pemahaman tentang peran daur ulang serta permasalahannya di industri metalurgi secara menyeluruh dan peranan engineer di dalamnya 
  5. Mahasiswa mampu berkomunikasi dengan baik sebagai sebuah tim dalam perancangan laporan presentasi mengenai masalah daur ulang dan perancangan pabrik ekstraksi daur ulang logam 
  6. Mahasiswa mampu mempresentasikan laporan mengenai isu daur ulang dan rancangan pabrik daur ulang logam 
  7. Mahasiswa mampu bekerja sama sebagai tim dalam penyusunan laporan presentasi isu daur ulang di industry metalurgi 
  1. Students have an understanding of physical and chemical separation and life-cycle assessment
  2. Students have an understanding of the recycling of steel, aluminum, copper, lead, zinc, rare metals, and waste electrical and electronic equipment.
  3. Students are able to design metal recycling extraction plants
  4. Students have an understanding of the role of recycling and its problems in the metallurgical industry as a whole and the role of engineers in it.
  5. Students are able to communicate well as a team in designing presentation reports on recycling issues and designing metal recycling extraction plants.
  6. Students are able to present reports on recycling issues and metal recycling plant design
  7. Students are able to work together as a team in preparing presentation reports on recycling issues in the metallurgical industry.
Metode PembelajaranCeramah dan TugasLecture and Assignment
Modalitas PembelajaranKuliah sinkron secara luringSynchronized Offline Lecture
Jenis NilaiABCDE
Metode PenilaianTugas Presentasi dan diskusi (30%); UTS (35%); UAS (35%)Presentation Assignment and Discussion (30%); Midterm Examination (35%); Final Examination (35%)
Catatan Tambahan